News

Road rehabilitation within the summer break

The road (Am Kräherwald) is one of the most important radial roads from Stuttgart downtown in the direction of Leonberg, Böblingen and to the highway access. The complete construction time was 6 weeks.

Construction of the bearing layer from a containerterminal in Rotterdam

Rotterdam - In one of the biggest Harbours in the world, the bearing layer of a container terminal was stabilized with NovoCrete®.

German Press celebrates rehabilitation of the connecting road K5508 Hopfau-Glatt with NovoCrete®

The K5508 is an important connceting road beetween Hopfau und Glatt (Black Forest-Germany). It is very awkward to detour the road. Due to the need for rehabilitation, the road had to be closed.

Backwater canel convinces with NovoCrete®.

In Croatia a backwater canal was built by using the NovoCrete® technology. There was a trench dug and then the on-site material was stabilized with NovoCrete.

Products

NovoCrete

NovoCrete® is a mineral additive combined with conventional cement during soil stabilisation. This mixture increases the development of crystals during the hydration process.

10 benefits

There many arguments in favour of adding NovoCrete® when stabilising soil. These include a variety of environmental as well as economic benefits.

Comparison

When comparing the conventional method and the NovoCrete® method, huge savings potentials are revealed by this one example.

Newsletter

Career

Are you looking for a challenge in an international environment and do you enjoy taking on responsibility? Then please don’t hesitate to contact us.

nach oben