Location: | Hamburg, Germany |
Execution: | September 2024 / November 2024 |
Milling depth: | 40 cm |

Location: | Hamburg, Germany |
Execution: | March - September 2023 |
Milling depth: | 35 cm |
Factors of success: | A very high proportion of clay soil was compacted to be frost-proof, thus avoiding the need for soil replacement. |

Location: | Heilbronn, Germany |
Execution: | August 2022 |
Milling depth: | 40 cm |
Factors of success: | Significantly faster construction compared to conventional technology, resulting in time and cost savings. |

Location: | Dormagen, Germany |
Execution: | May 2022 to February 2023 |
Milling depth: | 40 cm |
Factors of success: | The area was originally considered unsuitable for construction due to contamination in the existing structure; however, through design and surface sealing with NovoCrete®, the water rights application was approved. |

Location: | Haiming, Germany |
Execution: | July 2021 |
Milling depth: | 30 cm |
Factors of success: | Immobilization of PFC-contaminated soil material |

Location: | Metzingen, Germany |
Execution: | February/March 2021 |
Milling depth: | 25-50 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings |

Location: | Deißlingen-Lauffen, Germany |
Execution: | September 2020 |
Milling depth: | 30 cm |
Factors of success: | Very high load-bearing capacities, time and cost savings |

|
Location: |
Balingen, Germany |
|
Execution: |
May 2019 |
|
Milling depth: |
200 cm |
|
Factors of success: |
Replacement of deep foundations, time and cost savings, slate rock could be consolidated frost-proof |

|
Location: |
Eichenberg, Germany |
|
Execution: |
November 2018 |
|
Milling depth: |
30 cm |
|
Factors of success: |
Water contamination liability insurance license due to NovoCrete® |

| Location: |
Fellbach, Germany |
| Execution: | May 2017 |
| Milling depth: | 30–70 cm |
| Factors of success: |
Stabilization of silty clay |

| Location: |
Eislingen, Germany |
| Execution: |
June 2016 |
|
Milling depth: |
40 cm |
|
Factors of success: |
High savings of time and costs, no soil excavation |

| Location: | Herrenzimmern, Germany |
| Execution: | October 2015 |
| Milling depth: | 40 – 80 cm |
| Factors of success: |
Company was able to move into the new building before winter, maximum of time saving |

| Location: | Markgröningen, Germany |
| Execution: | April 2012 |
| Milling depth: | 50–80 cm |
| Factors of success: |
Very high load-bearing capacities, time and cost savings, conservation of resources |

| Location: | Stockach, Germany |
| Execution: | November 2011 |
| Milling depth: | 35 cm |
| Factors of success: |
No soil replacement necessary, saving of construction time and costs |

| Location: | Minden, Germany |
| Execution: | November 2010 |
| Milling depth: | 40 cm |
| Factors of success: |
Less transportation of soil and new materials to and from the site, high load-bearing capacity and frost resistance |