| Location: | Saudi-Arabia, Neom |
| Execution: | December 2023 – March 2024 |
| Surface area treated with NovoCrete®: | 90,000 m² |
| Factors of success: | Not aggregate minerals/stone crush material was imported for the project. The specialized company Oris (France) calculated a 40% carbon emission reduction for this project. Also, there were savings in the asphalt thickness. Cost wise the NovoCrete® approach ended up being 20-25% cheaper. |

Location: | Duisburg, Germany |
Execution: | December 2023 - October 2024 |
Milling depth: | 70 cm |

Location: | Himmelkron, Germany |
Execution: | July 2022 |
Milling depth: | 40 cm |
Factors of successs: | The complete refurbishment was completed on schedule in record time, with the least possible disruption to operations |

Location: | Renningen, Germany |
Execution: | October/November 2021 |
Milling depth: | 35 cm |
Factors of success: | The whole rehabilitation including installation of asphalt could be executed on weekends only, this timeline could only be met by using NovoCrete®. |

Location: | Herrenzimmern, Germany |
Execution: | October 2021 |
Milling depth: | 40 cm |
Factors of Success: | Immobilization of contaminated material, scrapyard was originally built on a non-bearing subsoil |

|
Location: |
Fichtenberg, Germany |
|
Execution: |
April 2019 |
|
Milling depth: |
40 cm |
|
Factors of success: |
Usage of the contaminated material on site |

|
Location: |
Stuttgart, Germany |
|
Execution: |
September 2019 |
|
Milling depth: |
40 cm |
|
Factors of success: |
NovoCrete layer was built with the official certificate of a water impermeable layer |

|
Location: |
Roth, Germany |
|
Execution: |
September 2018 |
|
Milling depth: |
40 cm |
|
Factors of success: |
Stabilization of unstable soil and ground |

|
Location: |
Ulm, Germany |
|
Execution: |
June 2017 |
|
Milling depth: |
50 cm |
|
Factors of success: |
Stabilization of unstable soil and ground |

|
Location: |
Aldersbach, Germany |
|
Execution: |
April 2016 |
|
Milling depth: |
30 cm |
|
Factors of success: |
High savings of landfill costs, time savings |

|
Location: |
Rottweil, Germany |
|
Execution: |
October 2015 |
|
Milling depth: |
35 cm |
|
Factors of success: |
Cost savings, pressure of time because of the day-to-day business |

| Location: | Stuttgart-Zuffenhausen, Germany |
| Execution: | December 2014 |
| Milling depth: | 35 cm |
| Factors of success: |
High savings on time and costs, short construction time |

| Location: | Waghäusel, Germany |
| Execution: | September 2014 |
| Milling depth: | 35 cm |
| Factors of success: |
High load-bearing capacity, secure and durable |

| Location: | Baruth, Germany |
| Execution: | October 2011 |
| Milling depth: | 35 cm |
| Factors of success: |
High load-bearing capacity, secure and durable |